The surface of the manhole cover bulging is like “quincuncial piles”, and driving is like “winding discus”. Yesterday, Ms. Pan, a citizen, called Haidu hotline 95060 to reflect that the road surface of Fuzhou Wenbo Road was manhole cover higher than the road surface, and the vehicle had to bypass the manhole cover. Manhole covers above the road surface can be seen everywhere on the road. Yesterday, the reporter came to the scene. Wenbo Road is a two-way two-lane road, with multiple rainwater and bilge well cover distributed in the middle of the road. The nearly one kilometer long Wenbo Road is roughly estimated to be distributed over 20 manhole cover, each is six or seven centimeters above the road surface. Some of these manhole covers are marked with the words “municipal administration office 1999”, while others are marked with the words “rain” and “pollution. After visiting the surrounding area, the reporter found that not only Wenbo road, but also the nearby Paradise Road had a similar situation. In the middle of the park road, some manhole covers are very close, and one can be seen every few steps. Nearby residents said that the traffic volume of this section is large, and so many manhole covers bulge out of the road surface, which brings great inconvenience to the passing residents. Once, he saw an electric car tripped by the raised manhole cover, and the male rider even fell to the ground with the car. Fortunately, there was no big deal. The reporter then contacted the municipal engineering management office, and the relevant personnel introduced that the manhole covers have now been handed over to Fuzhou water pipe network maintenance Co., Ltd for management. A relevant person named Lin from Fuzhou water pipe network Co., Ltd. introduced that Wenbo route Jin’an district construction bureau carried out the construction of “white to black”. It is expected that after the whole road construction is completed, the case of manhole cover bulge will be eliminated. Later, the reporter contacted the construction bureau of Jin’an district, and the staff confirmed that Wenbo Road was undergoing the construction of “white to black” and the manhole cover was upgraded. It was intended to lay asphalt in the near future. But in the meantime, they received a notice from the cable office and the power supply company, and the other party said that they would carry out the cable underground project. “We are all following up on this matter. Once the other party’s construction is completed, asphalt will be laid on the pavement immediately, and the manhole cover and pavement will be on a horizontal line.” (Reporter Zhu Minmin/Wen Mao Chaoqing/picture)