& shy; Traffic congestion section during peak hours in Fuzhou city (data map) & shy; Yesterday, Fuzhou Municipal Party Committee and municipal government held a mobilization meeting to control traffic congestion in urban areas. & shy; The meeting put forward the goal of three-year congestion control and announced the overall plan of Fuzhou congestion control. The plan is divided into five projects and five major actions. & shy; According to the meeting, the goal of the urban congestion control work is: by the end of 2016, the obvious traffic violations in the urban area will be significantly reduced, and the traffic disorder and congestion will be significantly reduced, the established transformation project was put in place, the law-abiding awareness of road traffic participants was significantly improved, and the road traffic efficiency was significantly improved; By the end of 2017, the main road networks in the central urban area were connected smoothly, and the traffic congestion sections were greatly reduced, the road traffic is standardized and orderly, and the travel environment is obviously improved; By the end of 2018, the functions of the central urban area will be effectively distributed, and the cross-shaped skeleton network of rail transit will be basically completed and used, and will be interconnected primary and secondary way, the bus rapid transit system runs orderly, the traffic congestion points in key areas are basically resolved, the traffic chaos is effectively curbed, and the satisfaction degree of mass travel is significantly improved. & shy; The meeting also revealed that Fuzhou Municipal Party Committee and municipal government will ensure that the trial operation of Metro Line 1 will be realized before the end of 2016. & shy; Put forward five projects including smooth road network & shy; Ensure that the bus lane setting ratio reaches more than 15% in 2018 to promote BRT construction & shy; It is understood that the five projects proposed at the meeting are specific: the old city dredging, the smooth road network, bus priority, intelligent traffic management, traffic integrity and other five projects. & shy; In terms of the relief of the old city, Fuzhou will accelerate the construction of the new district according to the direction for Urb-an development of “going east and south, going along the river to the sea”, further open the urban framework, and focus on the evacuation of the residential, medical and educational functions of the old city, relieve traffic pressure in the Old City. Encourage high-quality hospitals and primary and secondary school education facilities within the Second Ring Road to jointly set up and run schools in the new district. The number of beds and classes will no longer be increased in the existing courtyard areas and campuses within Gulou and Taijiang district. Move the south square passenger station of the railway station to the North Square, and demolish the South Park bus terminal of Wuyi Road. & shy; In terms of smooth road network, the construction and implementation of 100 “blocking” projects will be actively promoted. Among them, 9 projects of fast road network and “one after another” liaison channel, there are 62 road network projects in the central urban area, 6 transportation node projects, 6 skeleton road network projects in the new district, 14 pedestrian three-dimensional crossing facilities, and 3 channelized Island and non-joint reconstruction projects. This year, the reconstruction and construction of 46 “blocking” projects such as station East Road, Tower Bridge, Julong overpass lower ring Island, Nanjiang bindong Avenue and station east road Tianqiao were completed. & shy; In terms of bus priority, Rongcheng will accelerate the construction of rail transit to ensure the trial operation of the entire Metro line 1 before the end of 2016; Accelerate the construction of BRT (bus rapid transit system), strive to complete the planning work in 2016 and implement it in 2017; Develop and apply intelligent public transport dispatching platform, scientifically allocate public transport resources, update 350 buses this year and optimize 20 bus lines. & shy; In addition, Fuzhou will speed up the transformation of ground bus harbor stations, reduce the impact of bus vehicles on the existing road capacity, and transform 100 bus stations. Combined with road reform and expansion, bus lanes will be added to main roads with dense traffic in urban areas to ensure that the setting ratio of bus lanes will reach more than 15% by 2018. & shy; In terms of intelligent traffic control, the traffic police department will optimize and adjust 16 signal light intersections along the West Second Ring Road, North Second Ring Road and Lianjiang Road, 15 signal light intersections at both ends of the bridge across Minjiang River and 133 signal light timing schemes at primary and secondary way and large pedestrian flow. & shy; In addition, in the Lake East Road, 61 Road, East Street, Tongpan Road and Other 26 roads 118 signal light intersection set peak period and night signal light green wave coordination signal scheme, at the intersection is relatively independent, the traffic changes along the Second Ring Road, around the urban complex and 61 signal light intersections of traffic nodes to implement the peak period of adaptive allocation, reduce the traffic delay of vehicles at intersections. & shy; In terms of traffic integrity, Fuzhou will build a “credit Fuzhou” platform to bring serious traffic violations into the social credit system; in the “Fuzhou integrity construction information publishing comprehensive platform”, the list of broken promises and trustworthy likes of transportation was published, and the content of civilized transportation was incorporated into the daily management and evaluation of civilized units, implement exit punishment for units that frequently violate traffic regulations. & shy; Fuzhou will also encourage citizens to report traffic violations and explore the establishment of a reward mechanism. Through the function of mobile phone shooting, the traffic violations will be uploaded to the WeChat platform of “Fuzhou traffic police micro release”. After being examined and confirmed by the traffic police department according to law, rewards and punishments will be imposed on the reporting masses and illegal persons, build an interactive mechanism for mass participation in traffic governance. & shy; Original title: ensure the trial operation of Metro Line 1 before the end of this year & shy; Launch five major actions such as violation rectification & shy; Strive to build 6,000 public parking berths in the city this year to form a riding police team for blocking & shy; The mobilization meeting also launched five major actions, including the illegal rectification action to cure congestion. & shy; Among them, the illegal rectification action concentrated on the three-month major rectification action of road traffic violations, focusing on the rectification of illegal parking of motor vehicles, random changes in lanes, non-motor vehicles, on the basis of centralized rectification, pedestrians should explore and establish a long-term management mechanism. From 7: 00 to 22: 00 every day, carpet and continuous investigation are carried out on the blind roads, sidewalks and illegal parking that affect traffic in the central urban area to solve the traffic congestion caused by random parking. & shy; The parking operation strives to build 6,000 public parking berths in the city in 2016. & shy; Accelerate the transformation of the “fast forward and slow out” system of parking lots such as large urban complex and commercial shopping plaza, and complete the construction of parking lots in 18 complex urban areas by the end of this year. At the same time, it verified and investigated the illegal occupation of underground parking lots in 18 large complexes and shopping squares along the primary and secondary way of the urban area, and cleared the unauthorized occupation for other purposes according to illegal construction. & shy; Fast blocking action, implement “point-to-point” nearby command and dispatch mounted police, duty police, emergency trailer 5 minutes to deal with unexpected traffic incidents. Set up 40 cavalry to ensure the smooth flow of major arteries such as May 4th Road, Fufei Road and West Second Ring Road. According to the traffic status of roads around the scenic spots such as Vientiane Dragon, Aegean Sea, Sam’s member store, Sanfang seven lanes, Forest Park and so on, the “1.1 Policies” traffic control plan is formulated. & shy; In the aspect of green travel action, comprehensively investigate and rectify the problems of inconvenient travel, unreasonable setting and lack of road right protection in primary and secondary way non-motor vehicles and pedestrian traffic, forming convenient non-motor vehicles, good environment for walking traffic. Speed up the construction progress of convenient bicycle stations, on the premise of convenient connection and transfer with conventional public transportation and rail transit stations. & shy; In addition, a three-month “traffic volunteers in action” activity was organized. (Reporter Xu Caifang)