The reporter learned from the urban construction department of Fuzhou yesterday that the demolition project of the lower ring of Youxi Zhou Bridge started yesterday and is planned to be completed before the National Day. The original roundabout will become a cross intersection, and roads in each direction will form 3~5 lanes for motor vehicles to pass through. Effect diagram after the demolition and reconstruction of the head of South Bridge of Youxi Island Bridge According to the construction period, the first phase of construction takes one month, the outer enclosure of the original road, the removal of some green belts under the bridge for road widening to prepare for the second phase of Lane translation; The second phase of construction takes three months, the main purpose is to dismantle the central roundabout and carry out construction on three dedicated permanent separate right-turn lanes at the same time. The construction of the third phase takes one month, mainly adding five pedestrian and non-motor vehicle safety islands. At present, construction workers are dismantling green belts under some bridges in the direction of Pushang Avenue, widening lanes and preparing for the later traffic guidance reform. According to reports, in order to minimize the impact on citizens’ travel, they work in the enclosure during the day and do not occupy the road. The construction that needs mechanical operation is arranged after 22:00 and finished before the traffic rush hour comes. (Haidu reporter Wang Lincheng/Wen Mao Chaoqing/picture)