& shy; Jin’an district procuratorate bypass tunnel opened on 28th & shy; Next to the People’s Procuratorate of Jin’an district on Fuzhou Ocean Road, there is a pedestrian crossing the street zebra strips, and residents in Rongqiao East district and nearby often cross the road here. Yesterday, the Southeast Express reporter learned from the urban construction department of Fuzhou that the zebra strips will be closed on the 28th, and the pedestrian underground passage on the side will be opened in the early morning of the same day. & shy; Yesterday afternoon, the reporter of Southeast Express saw at the scene that the underground passage had been basically completed and the workers on site were preparing to do sanitary cleaning work. The whole underground passage is in the shape of “work”. One side of the passage is built in the form of stairs, while the other side is a slow ramp. The passage in the form of steps is convenient for pedestrians to enter and exit, ramp in the form of gentle slope is convenient for non-motor vehicles to go up and down. However, since the two non-motor vehicle special ramps of the underground passage are being laid with epoxy Silicon Carbide (for anti-skid purposes), it will take a week before non-motor vehicles can be opened. & shy; According to the introduction, the underground passage is surrounded by communities such as Sanmu Garden, Rongqiao East District, Sunrise East, etc. After the underground passage is opened, the surrounding residents will cross the road safely and conveniently. & shy; The staff of the urban construction department in Fuzhou suggested that the opening time of the two non-motorized bicycle clip ramps in the underground passage should be delayed by a week, therefore, citizens riding electric cars and bicycles nearby these days can bypass the non-motor vehicle ramp and the front cross viaduct through the Sanmu garden. & shy; In addition, the parking lot of Xiangda group, which belongs to Changfu intersection (west of the Second Ring Road) in the ocean road project, occupies sidewalks and some non-motorized lanes and cannot be constructed, it causes about 20 meters of people in this section to be non-mixed, and there is a big traffic hazard. & shy; The staff of Fuzhou city construction department said that the underground passage next to the People’s Procuratorate of Jin’an district was part of the Ocean Road reconstruction project, after the exit of the underground passage and the parking lot occupying sidewalks and non-motorized lanes on Changfu road of Ocean Road, even if all the reconstruction of ocean road is completed, Ocean Road will become more smooth.