Yesterday, Haidu reporter learned from the provincial government that our province recently issued the “three-year action plan for urban waterlogging prevention and control (2016-2018)”. In the next three years, Fuzhou will build rainwater storage facilities with storage capacity of millions of cubic meters to further enhance the city’s waterlogging defense capability. The Rongcheng flood point, which has been paid attention to and reported by Haidu daily for many times, was listed as the key renovation project of the action plan this time. The provincial government also requires municipal and county (district) governments to complete a comprehensive investigation of hidden dangers of urban waterlogging before the end of May this year, compile a risk map of urban waterlogging disasters, and take each drainage outlet as a unit, divide the minimum drainage area and formulate the waterlogging solution and project implementation plan according to the system. 3 years to improve the level of waterlogging prevention and control According to the prediction of the provincial meteorological bureau, the flood season before this year may start from the middle of April to the first half of May. The total precipitation during the flood season is too much in the whole province, and the situation of disaster prevention and mitigation is not optimistic. According to the historical statistical rules, in the second year after El Nio event (which will be bound in May) reaches its peak, the probability of continuous rainstorm process and severe flood disaster in Minjiang River basin in the first flood season of our province is relatively high. In addition, the number of typhoons landing or affecting our province this year is expected to reach 5 to 7. The action plan issued this time put forward the principle of urban waterlogging prevention and control of “foreign flood does not enter the city and river water does not jacking”. From 2016, it will take three years to significantly improve the level of waterlogging prevention and control, small and medium rain does not accumulate water, heavy rain does not cause serious waterlogging, and the operation of the city with extremely heavy rain is basically normal, without causing heavy property losses and casualties. This year, cities and counties (districts) in the province will comprehensively carry out the rectification of potential waterlogging hazards, drainage pipes and tailrace dredging dredging, and basically eliminate potential waterlogging hazards. The 10-year flood control plan will be completed within the year. In addition, the action plan specifies the key projects of urban waterlogging prevention and control in the province in the next three years, and proposes specific project construction period, among which Fuzhou has a number of projects. For example, the mountain flood prevention and ecological water supplement project in Jiangbei urban area, the 29.5-kilometer high water drainage project of this tunnel will cross the Beifeng mountain range, connect Bayi reservoir and Dengyun Reservoir in series, and the expected completion time is December 2019. During the transformation of urban waterlogging sites, the crossing Channel under kuipu bridge is planned to be completed in May this year; The upgrading plan of the crossing drainage system under beijiangbin CBD is completed this month. Urban Fufei Road underpass, Xiangban Branch Road, Huludao town, Mount Gui Road underpass, Sangao intersection, Degui Road, Wusi North Road Sports Center, Wusi Road shuhu, Daru family community, ten waterlogging spots such as Dengyun Road on the third ring road will be rectified this year and are planned to be completed in December this year. Fuzhou will also promote the construction of a batch of drainage Gates/stations along the river. Among them, the reconstruction of the May 4th drainage station will be completed in April, 2017. At the same time, 18 drainage Gates/stations will be implemented in Jiangbei urban area, Nantai Island, Changle, Minhou, Lianjiang, Minqing and other places. Promoting sponge city construction and improving emergency rescue capability The action plan also proposes to strengthen the control of source runoff, build a sponge city, and improve the capacity of water storage, stagnant water and seepage; Strengthen the maintenance and protection of drainage facilities, and fully complete the cleaning of drainage pipes and ditches, plus-sized the protection of facilities and punishment for damage; Improve the emergency system of drainage and waterlogging prevention. Before the flood season of 2016 comes, organize to formulate or perfect the emergency system involving meteorology, water conservancy, housing construction, municipal drainage, rivers, gardens, emergency plans for urban waterlogging prevention and control in sanitation, transportation, traffic police, education, electricity, communications, water supply, gas supply and other departments. (Haidu reporter Li Yi)