Mr. Lin’s child was studying at qinting Primary School in Dongpu Road, Fuzhou city. These two days, the child went home and complained that a demolition site near the school had been constructed these days, resulting in a lot of dust and floating into the classroom, there is a thick layer of gray on the desks. “So many children in the school are in class, and they are still very young. How can we not do dust prevention and dust reduction measures when this construction site is being demolished?” Yesterday, Mr. Lin called 95060 to make suggestions. Dust from the demolition site will float to the school, and some children also like to walk through the site after school. School teachers complain about dust interfering with teaching Yesterday afternoon, Haidu reporter came to qinting primary school and wanted to enter the school to understand the situation. The security guard at the school gate said that the principal was absent and could not be interviewed by reporters. After school at qinting Primary School, some teachers reported to the reporter that the dust generated by the demolition site beside the school had interfered with the normal teaching these days. “In the process of falling down, some buildings will instantly arouse a large amount of dust and float into the classroom.” One teacher said that many teachers couldn’t stand the dust, let alone the children. There is no dustproof net dust floating towards the school at the construction site. The demolition site is located in the northwest of qinting Primary School, less than 10 meters from the nearest place of the teaching building. When the reporter arrived yesterday, there was still an excavator under construction. There was no dustproof net or sprinkler dust on the site. When the excavator was under construction, there was indeed dust floating towards qinting primary school. On the north side of this demolition site, it is the house collection headquarters of the AC plot project of the comprehensive reconstruction project of Fuzhou Railway Station area. The reporter went to the headquarters to communicate with the staff. About ten minutes later, a fog gun carriage drove to the demolition site to sprinkle water and dust. In addition, the reporter also found that after school in qinting Primary School, many primary school students walked into the demolition site and went home through the gravel and reinforcing bar everywhere, causing potential safety hazards. The constructor said it would improve the dust prevention measures. The reporter from Haidu learned that Fuzhou ground source housing collection agency is currently responsible for the demolition of the site. Xu MOU, the head of the agency, said that during the demolition construction, there were fog gun carriage sprinkling water to reduce dust every day. “When the reporter came, fog gun carriage just went to add water. After adding the water, he rushed to the construction site to sprinkle water.” As for why there was no dustproof net set at the demolition site, Xu said that because qinting Primary School was also within the scope of demolition, there was no dustproof net set, “however, dustproof net will be set up on the side of qinting primary school this week, prevent dust from drifting into the school.” In addition, regarding the fact that a child broke into the demolition site, Xu said that he would open the road around the demolition site to prevent students from mistakenly entering the demolition site. (Haidu reporter Chen Chao/Wen Xiao chundao/picture)